As the summer rolled on, Allison was busy with her job as marketing director at Ithaca Beer Co. and Greg was busy on tour in Europe. Meanwhile, back on the farm, we hired the Reynolds boys to build another barn. This one was designed to have two big barn doors on either end so equipment and cars could pass all the way through without turning around. It also was planned to have a storage loft overhead.


It's location is on the high-point of the property, so we refer to it as the "upper barn." As in the construction of the "lower barn," 8X8 poles are embedded in a gravel pad, "stringers" of 2X6 roughcut pine are nailed between them, and factory built trusses are placed atop the structure. After the tin roof is nailed on, the concrete floor is poured and screed.


After the cement cured, the boards and batten strips were put on, windows and doors hung, and a white oak stairway was assembled leading to the loft. And there was much rejoicing.