Fall and Winter 2011


The fall came. As we celebrated the season by our stream, the leaves changed in the trees along the bank, and the house slowly took shape inside and out.


Anderson 400 series windows made their way from our lower barn into their rough openings. A vestibule (mud room) was added as a passageway between the future garage and the main building. The roof was shingled and the interior walls were framed. Don Ruff, the carpenter, began his interior work by tiling the downstairs bathroom. He is also our cabinetmaker, stairmaker, and mantlebuilder. Notice the paint-grade poplar corner cabinet he made.