Graham and Dad formed a team too. We bought a used airless sprayer and put a prime coat on the entire surface of drywall. This included the ceiling and walls and one of us sprayed while the other used a roller to "knock down" the applied paint. We swapped every few hours. This took us about 2 weeks. We bought tyvek suits for this activity which made us look like we should be at NASA.

After the painting, we decided to make use of our space suits by undertaking the most dusty, miserable job of them all: Cellulose insulation.

We spent three full days breaking up bricks of cellulose into a hopper that fed a blower tube. The blower tube extended up to the attic and we sprayed 13 inches of cellulose insulation over the entire second floor ceiling. Since 1.5 inches of foil-faced rigid insulation was installed first (behind the drywall of the ceiling) we were able to achieve an R-value of 40. By modern building standards, this is ideal.
Graham and I agreed - it feels good to have such good insulation, but that is such a filthy job; we are glad we won't be doing that again.